31 MAR 2023, Dispatchers’ List with Category I and II Closures/Obstructions
Port Partners,
Today's updated Dispatchers' List is attached. A daily posting of this document can be found here:
Please take note of upcoming Channel Closures/Obstructions on the schedule to include:
DATE/TIME | CAT | TYPE | LOCATION | STATUS |
03 APR 0700-1400 | I | ROLL ON/ROLL OFF | POWELL INDUSTRIES (CARPENTERS BAYOU) | APPROVED |
Week of 03 APR | II | DREDGE PIPE REMOVAL | T&T PELICAN – TX A&M GALVESTON | TENTATIVE |
09 APR | I | DREDGE PIPE INSTALL | BAYPORT LT 9 | TENTATIVE |
Shoaling is reported to reducing depths in the Galveston Harbor Channel to approximately 40 feet. This report has been correlated with US Army Corps of Engineers (USACE) dredging stations 2+400 to 4+600.
Vessel Traffic Service Houston-Galveston directs:
(1) Vessels with 38 feet or greater draft to avoid the green side of the channel in this area;
(2) No meeting or overtaking of any vessel with draft of 38 feet or greater between Galveston Channel Lights 2 to 3.
Best regards.
Randy Scott
Operations & Training Manager
Vessel Traffic Service
Sector Houston-Galveston
281.464.4827 w
Michael.R.Scott@uscg.mil