BLACK WARRIOR TOMBIGBEE WATERWAY, ALABAMA MODIFIED OPERATING HOURS FOR HOLT LOCK & DAM RIVER MILE 347

Notice Number: 213889/26-62
Date: 05/14/2026 14:00 thru 05/14/2026 15:00 CDT

Reference to Navigation Bulletin 26-38

Notice is given to mariners that Holt Lock (River Mile 347) will be periodically closed and operate under a modified schedule starting Monday, 12 January 2026 to perform repairs on a damaged lock monolith. The modified lock operation schedule will be as follows:

A waterway users call is scheduled for 14 May 2026 at 1400 CDT to provide information regarding the closure. Join on your computer, mobile app, or room device: https://dod.teams.microsoft.us/l/meetup join/19%3adod%3ameeting_f9018ce4ec7c4041b0bcec62981eb390%40thread.v2/0?context=%7b%2 2Tid%22%3a%22fc4d76ba-f17c-4c50-b9a7-8f3163d27582%22%2c%22Oid%22%3a%22e202419e 62cd-4af1-9259-598613bb5a3d%22%7d

Or call in (audio only):

Dial-in Number: (503) 247-9433

Conference ID: 147 626 433#

For further information regarding this work, please contact Holt Lock at (251) 276-3293, or Mr. Chad Brumelow at the BWT/Alabama-Coosa Project Management Office at (205) 752-3571.

//signed//

Green, Ryan A