Cannelton Lock & Dam: Lock Chamber Closure Ohio River Mile 720.7
Notice Number: 201698/2022-061
Date: 12/13/2022 11:24 thru 12/13/2022 11:24
Primary (1200 ft) Chamber Closure: The Primary (1200 ft) Chamber will be closed on December 13, 2022, for 10 hours to install the new floating mooring bitts. All traffic will pass through the Auxiliary (600’) Chamber during this time.
//signed//
Kate Brandner, PE
Interim Chief, Technical Support Branch