CAT I closure of Galveston Channel – Dredge Pipeline
@ 1050hrs:
Vessel Traffic Service Houston/Galveston directs no vessel movements between T&T Marine dock and the pierhead for Galveston dock 37/38 from 0900-1300 hours (LOCAL) on Monday August 21st, 2023 due to dredge pipeline operations.
T&T Marine is approximately 1.06 nautical miles East of the Pelican Island Bridge, red side of the Channel.
Dock 37/38 pierhead is approximately .63 nautical miles East of the Pelican Island Bridge, green side of the Channel.
Vessels will not be allowed to stop or push in along the channel during the closure.
//signed//
Very respectfully,
Vessel Traffic Service
USCG Sector Houston-Galveston
(281) 464-4837 24/7 Watch Supervisor
HoustonTraffic@uscg.mil