Channel Maintenance Dredge USACE Dredge Potter Upper Mississippi River Mile 184.1
Notice Number: 215399
Effective: 10/26/2026 17:00 thru 11/01/2026 07:00 CDT
1. Commencing on or about Monday, 26 October 2026, and continuing for approximately 6 nights, the US Army Corps of Engineers Dredge Potter will perform channel maintenance dredging at the lower Chain of Rocks canal.
2. There will be nightly river closures in the vicinity of the dredge plant from 1700 to 0700 to facilitate efficient dredge production.
3. The Dredge Potter and its attendant plant, to include tender boats, small boats, barges and pipeline, etc., work 24 hours a day, 7 days a week. When dredging, removed river bottom material is pumped through a pontoon pipeline or self floating pipeline, which may be crossing the channel, and is placed outside of the navigation channel.
4. The USACE Dredge Potter can be contacted on Marine Channel 13 or 16.
5. For the latest updates, channel condition reports, and recent channel surveys, please visit htttps://www.mvs.usace.army.mil/Missions/Navigation/
FOR THE DISTRICT ENGINEER:
//signed//
Andrew C. Schimpf, P.E., Rivers Project Manager