Channel Maintenance Dredging 23 July 2025 Update USACE Dredge Potter Upper Mississippi River Mile 196, and 207

Notice Number: 211376-3
Effective: 07/22/2025 00:00 thru UNTIL FURTHER NOTICE CDT

  1. The Dredge Potter's first assignment has been postponed. An update will be provided no later than Monday, 28 July 2025.

FOR THE DISTRICT ENGINEER:

//signed//
Andrew C. Schimpf, P.E., Rivers Project Manager