Channel Maintenance Dredging USACE Dredge Potter Upper Mississippi River Mile171.5
Notice Number 211376
Effective: 07/22/2025 00:00 thru UNTIL FURTHER NOTICE CDT
- Commencing on or about Tuesday, 22 July 2025, and continuing until further notice, the US Army Corps of Engineers Dredge Potter will perform channel maintenance dredging at various locations on the Upper Mississippi River from mile 300.0 to 0.0.
- The Dredge Potter will begin dredging operations at river mile 171.5 UMR. Work at this location is estimated to be complete on 28 July 2025. Updates to the Dredge Potter's schedule and work locations will be provided as work progresses.
- The Dredge Potter and its attendant plant, to include tender boats, small boats, barges and pipeline, etc., work 24 hours a day, 7 days a week. When dredging, removed river bottom material is pumped through a pontoon pipeline or self floating pipeline, which may be crossing the channel, and is placed outside of the navigation channel. Mariners should be on the lookout for tender boats, barges, small survey boats, and pipeline when transiting the dredge area.
- For passing arrangements, the USACE Dredge Potter can be contacted on Marine Channel 13, or 16. Mariners are urged to transit at their slowest safe speed to minimize wake and proceed with caution after passing arrangements have been made with the dredge.
- For the latest updates, channel condition reports, and recent channel surveys, please visit htttps://www.mvs.usace.army.mil/Missions/Navigation/
FOR THE DISTRICT ENGINEER:
//signed//
Andrew C. Schimpf, P.E., Rivers Project Manager
