Completed Illinois Waterway Dredging LaGrange Pool, Grape Island/Beardstown, RM 86.8 – 87.8
Notice Number: 211729-2 / IW 25-211729-2
Effective: 08/25/2025 12:00 thru 09/08/2025 08:00 CST
COMPLETED
Hydraulic USACE Dredge Goetz operations will commence on the Illinois Waterway, LaGrange Pool, Grape Island/Beardstown, RM 86.8 - 87.8 on Monday August 25th, 2025 at 1200hrs. Dredging will occur until further notice.
USACE Dredge Goetz and its attendant plant, to include tender boats, small boats, barges and pipeline, etc., work 24 hours a day, 7 days a week. When dredging, removed river bottom material is pumped through a pontoon pipeline, which may be crossing the channel, and is placed outside of the navigation channel. Mariners should be on the lookout for tender boats, barges, small survey boats, and pontoon pipeline when transiting the dredge area.
Mariners are requested to contact the USACE Dredge Goetz on Marine Channel 13, or 16, THIRTY minutes prior to transiting the area for passing instructions.
Mariners are urged to transit at their slowest safe speed to minimize wake and proceed with caution after passing arrangements have been made.
//signed//
Jarin Rudsell, Chief, Channel Maintenance Section Operations Division
