Dredging Operations Gulf Intracoastal Waterway Harvey, IHNC, Algiers Locks

Notice Number: 201126

Date: 7/13 - 8/15

Commencing on 13 July 2022 and continuing until approximately 15 August 2022, the U.S. Government Contract Cutterhead Dredge MIKE HOOKS will be working in the forebays at Harvey, Industrial Harbor Navigation Canal (IHNC), and Algiers Locks.

The Dredge will work 24 hours a day, 7 days a week, and the dredged material will be deposited through floating pipelines into deep water of the Mississippi River.

The Dredge will be monitoring VHF channels 16 and 67.

Mariners are urged to transit at their slowest safe speed to minimize wake and proceed with caution after passing arrangements have been made.

 

//signed//

MICHELLE C. DAIGLE
Chief, Technical Support Branch
Operations Division