Eugene Carter Bridge Inspection Kanawha River, Mile 57.6
Notice Number: 215159 / 26-28
Effective: 10/19/2026 06:30 thru 10/23/2026 16:30 EDT
Notice is given that on or about 19 October 2026, Amherst Madison, Inc. contractor for E.L. Robinson Engineering, will begin inspection on the Eugene Carter Bridge, Kanawha River, mile 57.6. Inspection will be performed on the bridge piers and will not entail the temporary anchoring of the floating plant within the channel limits.
The contractor's floating plant will consist of the M/V LADY LOIS, one spud barge, and one barge mounted manlift. The M/V LADY LOIS will be monitoring marine channels 13 and 16. The work will be performed from 6:30 a.m. to 4:30 p.m., Monday through Friday, and is expected to be completed on or about 23 October 2026.
During non-working hours, the floating plant will be moored at the jobsite, outside of the navigation channel, and lighted according to regulations.
Mariners are requested to be alert to the location of the floating plant and transit at their slowest safe speed to minimize wake and proceed with caution.
//signed//
Orwig, Matthew M, Chief, Technical Support Branch
