Geotechnical Soil Borings for Proposed Waterline OHRM 350.2
Notice Number: 202270/NTNI 23-10
Date: 03/16/2023 00:00 thru 06/30/2023 23:59
Notice is given that on or about 16 March 2023, S&ME Inc. will begin soil borings adjacent to the navigation channel limits on the Ohio River, Mile 350.2.
The contractor’s floating plant will consist of the M/V THE CAROLINE and one spud barge. The M\V THE CAROLINE will be monitoring channels 13, 16 and 65. Work will be conducted 24 hours per day, 7 days per week and is expected to be completed on or about 30 June 2023.
During non-working hours the contractors floating plant will be moored at worksite and lighted according to regulation.
Mariners are urged to pass at the slowest safe speed to minimize wake and proceed with caution after passing arrangements have been made.