Terry,
The repair crew were successful in getting the upper gates to miter and the lock chamber has been put back in operation. There is one boat locking now and six more in queue.
There still exists resistance with the upper left gate reaching the sill and the dive team is being assembled and preparing to inspect the sill and upper gates at some point today. The lock will shut down again once they are ready to go and I will let you know when that happens. We are optimistic the divers will be able to identify the issue and get it corrected.
Any questions, just let me know.
Thank you,
Doug
From: Morgan, Douglas S CIV USARMY CEMVR (USA)
Sent: Tuesday, August 18, 2026 7:38 AM
To: Terry Bass <tbass@blessey.com>; Kyle Rosenwald <kyle.rosenwald@ingrambarge.com>
Cc: Castro, Robert V CIV USARMY CEMVR (USA) <Robert.V.Castro@usace.army.mil>
Subject: Lock Stoppage at Starved Rock Lock
Good morning
At 0100 the crew at Starved Rock Lock ran into an issue where a suspected obstruction is preventing the upper miter from reaching miter. They had just locked a northbound double, and the vessel was shoving out hard due to the current high outdraft (30’ of gate). When the lock operators went to turn the chamber around to receive the next tow, that was when the issue was discovered.
Repair crew personnel are on site and are working the problem. Currently there are 5 tows waiting in turn, 4 straight singles and a double.
I will update you when we are back in operation.
Thank you.
Douglas Morgan
Chief of Locks and Dams
USACE Rock Island District
Illinois Waterway
P: (309) 676-4601 ext 4117
C: (309) 253-3366
Per email from Terry Bass