Louisville District Channel Maintenance Dredging Raliegh Bar Ohio River Mile 855
Notice Number: 215036 / 2026-054
Effective: 09/13/2026 00:00 thru 09/21/2026 23:45 EDT
Notice is given that “Luhrs Bros., Inc” will commence channel maintenance dredging in the Ohio River at the Raliegh Bar, at Mile 855. Dredging operations will be conducted approximately 13-21 September 2026, 24 hours per day, seven days per week. During this period, the Dredge Bill Holman will be in the navigation channel and the disposal pipeline may be crossing the navigation channel, requiring the disposal pipeline to be opened for passing traffic. Contact the Dredge Bill Holman for passing instructions on marine channel 13. Once contact has been made with the Dredge Bill Holman, proceed at the slowest safe speed.
The contractor’s floating plant will consist of the Dredge Bill Holman, M/V’s LENARD and BUDDY, and the ROBERT T, one shop barge, one spill barge, and floating pipeline section. The Dredge Bill Holman, M/V’s LENARD and BUDDY will be monitoring marine channel 13.
//signed//
Kenney, Shawn M, Chief, Technical Support Branch
