McAlpine Locks & Dam Electrical Testing Ohio River Mile 606.8
Notice Number: 211898 / 2025-042
Effective: 09/22/2025 07:00 thru 10/03/2025 17:00 EDT
McAlpine Locks and Dam (Ohio River Mile 606.8): USACE will conduct electrical testing throughout the site from September 22nd through October 3rd. During this time one lock chamber at a time may be closed to navigational traffic for up to 10 hours, 0700 -1700, Monday-Friday. Testing will start on the South Lock Chamber. Once the South Lock Chamber is complete, the closures will move to the North Lock Chamber.
One lock chamber (both are 1200’) will remain open and pass navigation traffic at all times.
All navigation traffic shall take direction from McAlpine lock operators for all lockage procedures and all lock closures.
//signed//
Kenney, Shawn M, Chief, Technical Support Branch
