McAlpine Locks & Dam Portland Canal LG&E Aerial Power Line Replacement Ohio River Mile 605
Notice Number: 211897 / 2025-041
Effective: 10/15/2025 07:00 thru 10/23/2025 19:00 EDT
A contractor for Louisville Gas and Electric (LG&E) will be repairing a transmission tower and replacing Aerial Power Lines which cross over the Portland Canal just upstream of McAlpine Locks and Dam, at Ohio River Mile 605. This work will occur 15-23 October 2025, Monday – Friday, 0700-1900 ET.
Navigation traffic restrictions detailed below are expected to ensure marine safety:
· 15-16 October: Intermittent River closures, up to 8 hours duration per day between 0700 - 1900 ET
· 17-19 October: No impact to navigation traffic
· 20-21 October: River closure up to 8 hours duration, 0800-1600 ET each day
· 22 October: No impact to navigation traffic
· 23 October: River closure up to 8 hours duration, 0800-1600 ET
Most equipment used for this work will be on land, but a helicopter will be used to fly ropes into place on the towers. A safety boat will be in place at the upstream end of the canal to enforce the safety zone under the power lines during the river closure periods.
The vertical clearance under the Aerial Power Lines will remain equal to or greater than the normal 95.1’ clearance at normal pool when the river is open to traffic.
All navigation traffic shall take direction from McAlpine lock operators for all lockage procedures and all river closures. McAlpine lock operators will be on Marine Channel 13.
//signed//
Kenney, Shawn M, Chief, Technical Support Branch