URGENT – Emsworth Lock: Slow down Exiting Chamber (Critical to Operations)

All,
This needs immediate attention across the board.

We are seeing excessive wheelwash while vessels are exiting the chamber at Emsworth, which continues to cause serious issues. We have again dislodged a bulkhead from the wall due to wheel wash. Every time this happens, we are losing valuable locking time and putting the overall schedule at risk.

This is now critical.

At a minimum, each incident costs significant time just to reset bulkheads and reestablish the work area before work can resume. These are not quick fixes. In more severe cases, conditions may prevent immediate reset altogether, forcing additional flooding, lost work windows, or even diver intervention. If that happens, we could be looking at multiple days of delay per incident that we will not be able to recover.

There are also scenarios where additional measures (like securing bulkheads in place or repeated equipment teardown/realignment) would further extend the timeline and eliminate opportunities for any schedule recovery or extended openings.

Bottom line:
We cannot continue down this path.

Effective immediately – all vessels must:
• Exit the chamber as slow and controlled as possible
• Be clutched ahead only enough to safely clear
• Eliminate wheel wash impacting the bulkheads and chamber walls

Please push this down to every crew. This is a controllable issue, and we need full cooperation to prevent further impacts.

If we don’t get this corrected now, we are in real danger of extending the project and/or losing critical time in our opening phases.

Appreciate everyone’s attention and immediate action on this.
--
Thank you,
Shane Checkan
General Manager
Industry Terminal & Salvage
VP / Navigation Committee Chairman
Waterways Association of Pittsburgh
724-462-1986

As reported by email from Steve Southern