Navigation Notice: Ohio River

CALENDAR YEAR 2022
SCHEDULED LOCK OUTAGES

 

NOTICE NUMBER:  18069
EFFECTIVE:  01/19/2022 12:23 thru 12/31/2022 12:23 EST

 

Smithland Locks and Dam (Ohio River mile 918.5):  The land chamber will be closed from January 21, 2022 through February 04, 2022 for the replacement of the land wall valve cylinders by the Light Capacity Fleet.

 

Cannelton Locks and Dam (Ohio River mile 720.7):  The Primary (1,200 ft) chamber will be closed intermittently from 26 January through 28 May 2022 for replacement of the Floating Mooring Bitt Tracks.

 

The Auxiliary (600 ft) chamber will be closed from 28 May through 4 July 2022 to allow replacement of the anchor arms and prep for the Primary Chamber closure by the Heavy Capacity Fleet.

 

The Primary (1,200 ft) chamber will be closed from 5 July through 19 November 2022 to allow replacement of the miter gates by the Heavy Capacity Fleet.

 

//signed//

 

Tracey Keel
Ch. Technical Support Branch