AMENDMENT TO NAVIGATION NOTICE 11960, 20-17:
DELAY IN LOCKAGE TIMES AT LITTLE GOOSE NAVIGATION LOCK

 

NOTICE NUMBER: 12067 / 20-17a / 11960-1
EFFECTIVE: 05/26/2020 07:00 thru 06/25/2020 06:30 PST

 

Due to inspection and repair work required for three of the navigation lock’s four tainter valves at Little Goose Lock and Dam, these valves will be removed from service one at a time starting 0700 26 May 2020. The work is estimated to be complete by 1800 2 July 2020. This work will result in a 15-20 minute delay in lockage time during this period. All work on the Little Goose navigation lock’s tainter valves is now completed and the lock is returned to full service.

 

PROJECT AFFECTED: Little Goose Lock and Dam – Snake River Mile 70.3 For additional information on this work contact the Little Goose Shift Operator at (509) 399-2233, x231.

 

//signed//

 

Kenny Koebberling
Navigation Business Line Manager