ILLINOIS WATERWAY MECHANICAL DREDGING (Strike Removal) Peoria Lock Lower RM 157.5

ILLINOIS WATERWAY MECHANICAL DREDGING (Strike Removal) Peoria Lock Lower RM 157.5 Notice number: 201680 Date: 12/08/2022 09:00 thru 12/08/2022 23:59 Mechanical Dredging (Strike Removal) will begin at 0900 hrs on Thursday Dec 8th, 2022 on the IWW, Peoria Lock lower river mile 157.5 to remove a shoal on the left descending bank.  Dredging is only…
Read More

Brandon Road Interbasin Project – Navigation Smaller Workshop

Brandon Road Interbasin Project – Navigation Smaller Workshop Sorry for such a short notice but I just received this today, if you can put in some of your comments and get them back to me, the meeting is tomorrow at 1300. I am sending out this Questionnaire for everyone to look at and if you…
Read More

Lock Restriction Lockport Lock & Dam

Notice Number: 201678 Date: 12/06/2022 10:30 thru 12/07/2022 12:00 1. The Lockport Lock, RM 291, will operate under restricted locking conditions between 1000 CST on Tuesday, December 6th, 2022 until 1200 CST on Wednesday, December 7th, 2022. Under these restricted operating conditions, the Lockport Lock and Dam will be unable to pull northbound cuts. The…
Read More

Completed Lock Closure: La Grange Lock & Dam, River Mile 80.2

Notice Number: 201671-1/IW 22-201671-1 Date: 12/06/2022 08:00 thru 12/06/2022 12:00 La Grange Lock will be closed to all navigation at 0800 hours on Tuesday, December 6, 2022 through 1400 hours on Tuesday, December 6, 2022. The purpose of the closure is for divers to repair intake screens. Mariners are requested NOT to tie up on…
Read More

All River Basins: USCG LNM’s for week 48-22

Please find the links to the USCG LNM’s for week 48-22 below: First District   Fifth District   Seventh District   Eighth District: Western Rivers   Eighth District: Gulf Coast   Ninth District   Eleventh District   Thirteenth District
Read More

Mechanical Dredging (Strike Removal) Mackinaw River Lower, River Mile 147.0 to 147.2

Notice Number: 201654/IW 22-201654 Date: 11/28/2022 13:00 thru UNTIL FURTHER NOTICE Mechanical Dredging (Strike Removal) will begin at 1300 hrs on Monday November 28th, 2022 on the IWW Mackinaw River lower, river mile 147.0-147.2 Dredging will be performed Monday through Friday 0600-1800 until further notice. Contact the Creve Coeur on channels 14 and 82, Thirty…
Read More

Completed Mechanical Dredging (Strike Removal) Copperas Creek Upper River Mile 144.5

Notice Number: 201596-1/IW 22-201596-1 Date: 11/14/2022 14:00 thru 11/19/2022 15:00 Mechanical Dredging (Strike Removal) will begin at 1400 hrs on Monday November 14th, 2022 on the IWW Copperas Creek upper, river mile 144.5. Dredging will be performed Monday through Friday 0600-1800 until further notice. Contact the Creve Coeur on channels 14 and 82, Thirty minutes…
Read More

Completed Illinois Waterway Hydraulic Dredging: Clark Island, RM 215.0-216.0

Notice Number: 201570-1/ IW 22-201570-1 Date: 11/11/2022 00:00 thru 11/19/2022 21:00 The dredge Barry J has arrived at Clark Island, IWW river mile 216.0. Dredging operations will commence following the setup of equipment. Dredging of the right descending bankline from river miles 215.5-216.0 will occur Nov 11, 2022 24/7 until further notice. Contact the Dredge…
Read More

Mechanical Dredging (Strike Removal) Copperas Creek Upper River Mile 144.5

Notice Number: 201596/IW 22-201596 Date: 11/14/2022 14:00 thru UNTIL FURTHER NOTICE Mechanical Dredging (Strike Removal) will begin at 1400 hrs on Monday November 14th, 2022 on the IWW Copperas Creek upper, river mile 144.5. Dredging will be performed Monday through Friday 0600-1800 until further notice. Contact the Creve Coeur on channels 14 and 82, Thirty…
Read More

Safety Zone ILR 19.5-21

Date: 11/14/2022 thru 11/18/2022 Please distribute as needed. Attached is the safety zone for a power line crossing on the ILR mm 19.5-21. The safety zone is written for Mon-Fri of next week, but will be cancelled after the project is complete. It is scheduled for Monday from 8am to 5pm though if there are…
Read More