MSIB Vol XXV Issue 043 High Water Safety Advisory: VTS Safety Measure and Advisories between LMR MM 170 to MM 235 AHP LMR (40′ and Falling)

High Water Safety Advisory: VTS Safety Measure and Advisories between LMR MM 170 to MM 235 AHP LMR (40′ and Falling) MSIB Vol XXV Issue 043 LMR 170 – 235…
Read More →

Dredging Operations Mississippi River New Orleans Harbor

Notice Number: 210668 / MVN 25-45 Effective: 05/05/2025 05:00 thru 05/14/2025 04:45 Mariners are advised that beginning on 06 May 2025 and continuing through approximately 13 May 2025, the U.S.…
Read More →

River Closed at Vicksburg 1400 Update

1400 Update: River is open to traffic. Barge is located at the following with 68′ of water covering it: 32 18 19.795 N 090 54 37.9704 W Per email from…
Read More →

River Closed at Vicksburg

Just received a report of an allision with the Vicksburg bridge. One barge is confirmed sunk and the others have been (or being) caught. Currently, the river is closed 5…
Read More →

DREDGING OPERATIONS Mississippi River and Southwest Pass

DREDGING OPERATIONS Mississippi River and Southwest Pass Mariners are advised that beginning on or about 2 March 2025 and continuing through approximately 30 July 2025, the U.S. Government Contract Hopper…
Read More →

DIVE OPERATIONS Schooner Bayou Control Structure

DIVE OPERATIONS Schooner Bayou Control Structure Mariners are advised that Schooner Bayou Control Structure will be closed to navigation on 4 March 2025, from 7:00 a.m. until 6:00 p.m., for…
Read More →

BNM – LMR 920.8 Channel Reduction / One Way Traffic

ALL MARINERS ARE ADVISED OF A CHANNEL WIDTH REDUCTION TO 466 FEET AT LOWER MISSISSIPPI RIVER MILE MARKER 920-921.5. ALL MARINERS ARE ADVISED TO IMPLEMENT A ONE-WAY TRAFFIC PATTERN. SOUTHBOUND…
Read More →

Temporary Closure of Flotation Canal Near Slip A

Please be advised that Coastal Dredging will be shutting down Flotation Canal near Slip-A tomorrow morning, June 12, 2024, starting at approximately 0900 hours. This closure is required to facilitate…
Read More →

Pascagoula Harbor

On Thursday, May 09, 2024, at 10:00 a.m., Bollinger Ship Building on the west bank of the Bayou Casotte Harbor north turning basin, will side launch the tug, Genesis Spirit.…
Read More →