Update/MM 470.7-471.7/Safety Zone/SEC OHV BNM 0560-26 Update-1
By Anthony Gex |
THE CAPTAIN OF THE PORT OHIO VALLEY HAS ESTABLISHED A SECURITY ZONE AT OHIO RIVER MM 469 TO 470 TO EXTEND THE ENTIRE WIDTH OF THE RIVER FROM 10:15 A.M.…
Read More Olmsted Locks Conference Call
By Anthony Gex |
It was decided on yesterday’s call to have an industry provided assist boat at Olmsted while the river chamber is down for repairs. TVT (James) is providing the EMMA KATE…
Read More Notice to Navigation 2026-050 – Olmsted – Lock Chamber Closures
By Anthony Gex |
Please see attached lock maintenance NTNI for Olmsted Locks & Dam Attached is a copy of Navigation Notice No. 2026-050 dated September 3, 2026. Notice 2026-050 – Olmsted – Lock…
Read More Pike Island Locks and Dam Ohio River, Mile 84.2, Intermittent Closures of the Auxiliary Chamber
By Anthony Gex |
Notice Number: 215282 Effective: 10/19/2026 09:00 thru 10/23/2026 15:00 EDT 1) TO WHOM IT MAY CONCERN: Notice is given that the U.S Army Corps of Engineers Pittsburgh District will be…
Read More Safety/Kanawha River, MM 57.6/Bridge/SEC OHV BNM 0558-26
By Anthony Gex |
THE CAPTAIN OF THE PORT SECTOR OHIO VALLEY ADVISES ALL MARINERS THAT A BRIDGE INSPECTION PROJECT BY E.L. ROBINSON ENGINEERING THROUGH THE CONTRACTOR AMHERST MADISON. THE INSPECTION WILL BE OCCURING…
Read More NTNI 26-29 City of Middleport Launching Ramp, Ohio river mile 252.1
By Tessa Mullins |
Notice Number: 215258/26-29 Date: 11/02/2026 06:30 thru 12/06/2026 16:30 EDT Notice is given that on or about 02 November 2026, Amherst Madison Inc., contractor for Allard Construction, will install two…
Read More Pike Island Locks and Dam Ohio River, Mile 84.2, Intermittent Closures of the Auxiliary Chamber
By Anthony Gex |
Notice Number: 215174 Effective: 10/12/2026 09:00 thru 10/16/2026 15:00 EDT 1) TO WHOM IT MAY CONCERN: Notice is given that the U.S Army Corps of Engineers Pittsburgh District will be…
Read More Safety/MM 469-470 OHR/Security/SEC OHV BNM 0542-26
By Anthony Gex |
THE CAPTAIN OF THE PORT OHIO VALLEY HAS ESTABLISHED A SECURITY ZONE AT OHIO RIVER MM 469 TO 470 TO EXTEND THE ENTIRE WIDTH OF THE RIVER FROM 11:30 A.M.…
Read More Safety/Allegheny River/Closure/SEC OHV BNM 0537-26
By Anthony Gex |
THE CAPTAIN OF THE PORT PITTSBURGH ADVISES ALL MARINERS OF A FULL RIVER SHUTDOWN FOR A PADDLE BOAT RACE ON OCTOBER 10, 2026, ON THE ALLEGHENY RIVER MILE MARKER 20.5…
Read More Eugene Carter Bridge Inspection Kanawha River, Mile 57.6
By Anthony Gex |
Notice Number: 215159 / 26-28 Effective: 10/19/2026 06:30 thru 10/23/2026 16:30 EDT Notice is given that on or about 19 October 2026, Amherst Madison, Inc. contractor for E.L. Robinson Engineering,…
Read More