Notice to Navigators: Illinois River

Brandon Road Interbasin Project - Engineered Channel Layout -
Final Draft Engineering Evaluation Report -
Attachment Correction - Electric Deterrent

 

All:

 

I just discovered this morning that the attachment for the 65% Electric Deterrent Report in the subject report under review was an earlier presentation and not the 65% report that contains the recommended layout for the Electric Deterrent.  The correct file is attached to this email.

 

Thank you,

 

KIRK SUNDERMAN, P.E.
Project Engineer – Brandon Road Interbasin Project
Inland Navigation Design Center
US Army Corps of Engineers
Clock Tower Building  |  Rock Island, Illinois  61204-2004
Office: 309.794.5140
Cell: 309.207.0526