Notice to Navigators: Upper Mississippi River

RIAC FW: Dredge Potter channel closure 27DEC2021

As info

The Dredge Potter has completed work at mile 173. The Potter is moving up to mile 181.2 now, and should complete that location late tomorrow.  The Potter will return to the dock thru the weekend, and be ready to start work on Monday at mile 182.7 with the 24 river closure starting at 5pm.

Bernie Heroff
Port Captain
ARTCo