Ohio River Louisville District Channel Maintenance Dredging Smithland Locks & Dam Lower Approach Ohio River Mile 919
Notice Number: 211147 / 2025-024
Effective: 07/03/2025 06:17 thru 07/06/2025 00:00 EDT
Notice is given that “Luhrs Bros., Inc” will commence channel maintenance dredging in the Ohio River at Mile 919. Dredging operations will be conducted approximately 03 - 07 July 2025, 24 hours per day, seven days per week. During this period, the Dredge Bill Holman will be in the navigation channel and the disposal pipeline may be crossing the navigation channel, requiring the disposal pipeline to be opened for passing traffic.
On approximately 05 July 2025 the Smithland lock chambers will be closed to all traffic for up to12 hours to allow dredging at the middle lock wall bullnose. Contact the Dredge Bill Holman for passing instructions on marine channel 13. Once contact has been made with the Dredge Bill Holman, proceed at the slowest safe speed.
The contractor’s floating plant will consist of the Dredge Bill Holman, M/V’s LENARD and BUDDY, and the ROBERT T, one shop barge, one spill barge, and floating pipeline section. The Dredge Bill Holman, M/V’s LENARD and BUDDY will be monitoring marine channel 13.
//signed//
Kenney, Shawn M, Chief, Technical Support Branch