Patrick Street Bridge Inspection: Kanawha River, Mile 56.3

Notice Number: 203487/23-21
Date: 08/21/2023 06:30 thru 08/25/2023 16:30

Notice is given that on or about 21 August 2023, Amherst Madison, Inc. will begin bridge inspection work for E. L. Robinson Contracting, on the Kanawha River, mile 56.3. Inspection activities will be performed along the entire length of the bridge and will entail the temporary anchoring of the floating plant within the channel limits.

The contractor's floating plant will consist of the M/V LADY LOIS, one barge-mounted crane, and one barge mounted manlift. The M/V LADY LOIS will be monitoring marine channels 13 and 16. This work will be performed from 6:30 a.m. to 4:30 p.m., Monday through Saturday and is expected to be completed on or about 25 August 2023.

During non-working hours, the floating plant will be moored at the job site and lighted according to regulations.

Mariners are requested to be alert to the location of the floating plant. It is essential that mariners contact the M/V LADY LOIS for passing arrangements and transit at their slowest safe speed to minimize wake and proceed with caution.

//signed//

KENT C. BROWNING
Chief, Technical Support Branch