RIAC: UMR Winter Lock Closure Dates
The following UMR locks will be closed to all navigation during the dates specified below.
Mile Project Repairs Dates
- 796.9 Lock 3 Anchorage bar replacement 5 Dec 22 – 12 Mar 23
- 752.8 Lock 4 Anchorage bar replacement 5 Dec 22 – 12 Mar 23
//signed//
Kristin Moe
Chief, Mississippi River Project
St. Paul District - USACE
651-290-5146 office
651-792-5646 cell