Scheduled Bridge Maintenance: Lake Michigan-Indiana Harbor Canal BNM 0085-25

BNM#: 0085
Date: 0001 6/28 thru 2359 6/29 AND 0001 7/12 thru 2359 7/13
From 0001 on June 28 until 2359 on June 29, 2025, and again from 0001 on July 12 until 2359 on July 13, 2025, the Elgin, Joliet, and Eastern Railroad Bridge at Mile 0.68 over Indiana Harbor Canal will be secured to masted navigation for maintenance. Vessels able to pass under the bridge without an opening may do so at any time.
