SCHEDULED LOCK OUTAGES AT LITTLE GOOSE

Notice Number: 213458/26-15
Date: 03/30/2026 06:30 thru 04/08/2026 16:30 PDT

Beginning 0630 on 30 March 2026 and continuing thru 8 April 2026, the Little Goose navigation lock will be removed from service from 0630 to 1200 and from 1300 to 1630 daily, Monday through Friday. The lock will be fully open for service on weekends. These daily outages are necessary to allow the tainter valve replacement contractor to safely access the lock’s drain valve #1 to perform line-boring of the new tainter valve trunnions.

Vessels wishing to transit the lock between 1200 to 1300 during this outage period should coordinate with the lock operator either via VHF channel 14, or by calling 509-404-3231 a minimum of one-half hour prior to requesting a lockage. Requests for lockages that would commence after 1230 post midday will not be supported until the daily reopening at 1630.

PROJECT AFFECTED:

Little Goose Lock and Dam – Snake River Mile 70.3

For additional information on this work contact the NWW Operations Division at (509) 527-7364.

//signed//

Paul A. Ocker, Chief, Operations Division