Scheduled/WI – Lake Michigan – Fox River/Bridge/CGD-GL BNM 0107-26

On August 17 and August 18, 2026, between the hours of 0600 and 1400, each day, the Ray Nitschke Bridge at mile 1.58, over the Fox River will be secured to masted navigation. And from August 19, through August 21, 2026, between the hours of 0700 and 1600 the bridge will require a 2-hour advance notice for openings due to electrical repairs. Mariners should provide advance notice directly to the drawtender