Soil and Rock Test Boring Cumberland River Mile 189.5
Notice Number: 211647 / LRN 25-26
Effective: 09/09/2025 07:00 thru 09/15/2025 19:00 CDT
Terracon & Tri-State will be drilling test soil borings and rock cores at Cumberland River Mile 189.5 along both sides of the navigable river channel. The work will be conducted from a 12’x42’ barge with a mounted drill rig and a 10’x20’ pontoon boat.
Work will take place September 15-26, Monday-Friday from 07:00 AM to 07:00 PM as weather and water conditions allow.
The barge will be anchored along the existing bulkhead on the eastern bank (RDB) during non-working hours.
Contact Will McCloy at (859) 948-2039 or Alex Bittel at (423) 667-0600 with any questions regarding this project.
//signed//
Megan Simpson, Chief, Maintenance Section Technical Support Branch
