Underwater Excavation and Pipeline Repair Tennessee River Mile 246.4 LDB

Notice Number: 211093 / LRN 25-18
Effective: 07/21/2025 07:00 thru 08/29/2025 10:00 CDT

Starting July 21 and continuing through August 29, 2025, Sunland Construction will be excavating an area extending approximately 600 feet from the left descending bank at TRM 246.4 for the inspection and repair of a natural gas transmission pipeline. There will be two barges spudded to the river bottom within the workspace 24/7 to provide a barrier and shield to the spoil piles and underwater caisson.

Work will be in progress 7 days per week from 0700 to 2000 until the caisson is set and then 24 / 7 once the caisson is placed on the pipeline until the scheduled completion on August 29.

Mariners are asked to use extreme caution when transiting the area during this time and use Marine Radio Channel 16 for more information.

Questions regarding this project can be addressed to Jordan Schwartz, (704) 796-1005 or Cody Melerine, (504) 638-8183.

//signed//
Megan Simpson, Chief, Maintenance Section